Ein Vollkornmehlprojekt wird nicht durch den Namen seiner Mühle definiert. Vor dem Maschinenvergleich, Entscheiden Sie, was das fertige Mehl enthalten muss,...
Verfahren & Qualität
Verfahren & Qualität
Unternehmensnachrichten

Two lines can carry the same rated capacity and still put very different amounts of sellable product in the bag. Most of the time the machine brands have nothing to do with it. One of those lines was drawn around an actual mill: the paddy or the wheat it receives, the building it stands in, the grades its customers are willing to pay for. The other one was assembled from a catalog, machine by machine, and nobody ever stopped to check whether the pieces added up.
What follows runs roughly in the order a buyer works through, and roughly in the order we work through with them: what the line has to deliver, what each stage is for, why a machine list is not a line, where the price actually comes from, what to check before signing, and one order we signed in October 2026.
|
7
steps from paddy
to white rice |
5
steps from wheat
to bagged flour |
4
things that set
the final price |
20 t/d
latest signed order
(Tschad, Okt 2026) |

Every grain line protects three things, whether the owner thinks about them in those terms or not. Yield is how much of what goes in comes out as something you can sell. Grade is the price that product fetches. Uptime is how many days a year the plant is running rather than waiting on a part, a technician or an electrician. An equipment choice usually helps one of the three and quietly hurts another, and very few decisions come for free.
Most of the arguments we sit through at the specification stage come back to this. A bigger motor on its own does not produce more sellable rice. Another sieve deck does not raise the grade. What raises both is a flow where each stage takes out the right thing at the right size and hands the rest on without undoing the work of the stage before it.
Which means the first question is not which machine to buy. It is which of those three your market actually pays for. Sell in bulk to wholesalers and you live or die on yield and uptime, because nobody in that chain pays extra for gloss. Sell branded 5 oder 10 kg bags into shops and grade plus consistency decide it, since one lot that looks different from the last one costs you the shelf. Same budget, two quite different lines.
Each stage below is there to do one job, and the third column says what goes wrong when it is undersized or set badly. That column is the one to read twice. If cleaning is already where your line slows down, unser guide to choosing grain cleaning and screening equipment goes into that section in more detail.
| Bühne | What it does | What it protects |
|---|---|---|
| Reinigung | Siebe, A Entsteiner and a magnet take out straw, Streugut, stones and metal; paddy caked with mud also goes through surface cleaning | Machine life. One stone can score a huller roller; metal shreds whiteners months early |
| Schälen | Rubber rollers shear off the husk; the kernel should stay whole | Ertrag. Get the roller gap wrong and you trade whole kernels for broken ones, or paddy for brown rice |
| Paddy separation | Paddy and brown rice differ in density, width and surface friction; the separator splits the two streams and sends the paddy back to the huller for another pass | Grad. Paddy left in the brown rice shows up as a defect in the bag |
| Whitening | Abrasive or friction rollers strip bran in several gentle passes | Yield and look. One hard pass looks brighter, but you lose more good rice |
| Benotung | Sieves separate whole kernels from broken grains | Preis. A mixed lot always sells at the lowest grade’s price |
| Polieren | Friction polishing, often with a fine water mist, gives the surface its gloss — a step for premium and export grades, not for every mill | Shelf appeal. It matters most for export bags and branded retail |
| Color sorting | Optical sensors blow discolored or damaged grains out with air jets | Your food-safety record. One handful of discolored rice can trigger a complaint |

Of the seven, whitening and color sorting are where the last points of yield and grade get decided, and both behave differently on different grain. If you visit a factory, ask to see those two run on a sample of yours rather than on whatever paddy the mill happens to keep for demonstrations.


| Bühne | What it does | What it protects |
|---|---|---|
| Reinigung | Vorführung, Luftzerlegung, de-stoning and magnetic separation, plus surface treatment where the wheat needs it — scouring, or washing only when the raw wheat carries caked mud; siehe die cleaning equipment range | Purity. Whatever is not removed here ends up in the flour. Which surface treatment applies is decided by your wheat, not by a standard flow sheet |
| Temperieren | Water goes in; the grain rests so the outer bran comes off cleanly and the inside grinds easily | Flour yield and whiteness. Wrong moisture shows in your output within a single shift |
| Mahlen | Brechen, scratch and reduction rolls, one after another. Never one hard grind | Flour grade. How the passes are arranged decides how clean the flour stays |
| Sichtung | Plansiebe sift the ground stock after every pass and send the coarse particles back for regrinding | Consistency. This grind-and-sift cycle decides how much flour you get from every 100 kg of wheat |
| Verpackung | Weigh, fill and seal schnell, before the flour picks up air and moisture | Shelf life. And whether the mill keeps full output without hiring extra crew |


Two sections on the flour side deserve more of your attention than the rest. Tempering decides how much flour you get out of a tonne of wheat, and our piece on how wheat conditioning affects flour yield and quality explains what to watch during the rest period. Sifting decides whether that flour stays the same from one week to the next, und die plansifter selection guide shows how sifting area gets matched to the flow.
One more thing about capacity, because this is where quotations tend to get slippery. Ask what the tonne-per-day figure refers to: grain going in, or product coming out? Metric tonnes? Over how many effective running hours? Then run the arithmetic yourself. Twenty tonnes a day works out at 2.5 tonnes an hour across eight effective hours and 1 tonne an hour across twenty, which is only a unit conversion and says nothing about whether the plant will hold that rate. Output has separate terms of its own: rice is measured by total recovery and head-rice percentage, flour by extraction rate. Three different numbers, and a quotation that uses one in place of another tells you something about how carefully the rest of it was put together.
The costliest mistake we run into is not a bad machine. It is a set of good machines that were never designed to run together. Each one works perfectly well on its own and the line still does not work. An elevator lifts grain higher than the next machine will accept. The cleaner is rated faster than the hullers behind it can keep up with. A bin is too small to absorb a five-minute stop. Then something breaks and three suppliers stand around pointing at each other, because nobody sold you the connections.
What turns that collection of machines into a line is everything in between: Mülleimer, Aufzüge, spouting, Staubsammlung, the steel that holds it all up. Every piece has to be sized so one stage feeds the next at the same rate, and dust control is a scope of its own with its own site checks, which our piece on flour mill dust control covers. None of that shows up on a machine list, which is exactly why two quotations naming the same machines can sit a long way apart on price while both suppliers are being straight with you.
If a price arrives before anyone has asked how high your ceiling is, you have been sent a machine list rather than a line. Layout, discharge heights and the power supply decide which equipment can go in at all, so they come first.
A quotation built from a single number is a guess, no matter whose name sits at the bottom of it. The same rated capacity can be built for very different money depending on four decisions:
Write those four answers down before you start comparing prices, and put the same questions to every supplier so the numbers land on the same basis. Our manufacturer selection guide has a longer list of what to put to each of them.
Two offers that assume different automation or different cleaning sections are not comparable, however close the totals happen to look. If you want to see what a flour mill quotation ought to itemize, Die flour mill plant cost guide goes through it line by line.
If you would rather have those four checked against your own site before talking to anyone, send what you already know: Kapazität, grain and site. The layout comes back first and the price second, because that is the only order in which the price means anything. Start with your numbers.
If you already have a quotation in hand, send it over with your site dimensions. We’ll mark which of the six it answers and which ones it skips without saying so. It works on any supplier’s document, ours included. Have a quotation checked.
Reading a list of checks costs nothing. Carrying one into the meeting is another matter, so here are the three tables we fill in for every quotation, including the ones we write ourselves.
| Artikel | What to ask the quotation for | Im Lieferumfang enthalten / Optional / By buyer |
|---|---|---|
| Layout and plant design | A drawing made for your building, not a catalog layout | |
| Cleaning section | Sized to your impurities, with the surface treatment named | |
| Milling section | Machine models and the number of passes listed | |
| Structure between machines | Mülleimer, Plattformen, Aufzüge, piping — the part cheap quotes skip | |
| Electrical and control | Panels, cabling scope, who supplies the transformer | |
| Installation and commissioning | Days on site, and the acceptance test | |
| Bedienerschulung | Who trains, and for how many days | |
| Wear parts and spares | The list, and what the warranty covers |
Fill the third column from each offer, lay two of them side by side on the table, and the gaps stop being a matter of opinion.
| Term | The question to ask |
|---|---|
| Input or output | Is the t/d figure raw grain in, or sellable product out? |
| Unit | Metric tonnes? Confirm it in writing. |
| Betriebsstunden | How many effective running hours does the rating assume? |
| Hourly load | t/d ÷ effective hours = t/h. Für 20 t/d: 2.5 Das 8 Std., 1 Das 20 — arithmetic, not a performance guarantee |
| Output terms | Reis: total recovery and head-rice percentage. Mehl: extraction rate. Separate numbers. |
| Punkt | To agree in writing |
|---|---|
| Rohstoff | The grain and its condition the test is run on |
| Stable run | How many hours at rated load before readings count |
| Produkt | The grade and specifications to be met |
| Sampling and weighing | Who samples, where, and which scale is used |
| If it fails | Re-test, rectification, or who carries the cost |
Plants in the United States carry one extra layer. Dust control in grain handling, access for maintenance and the split of on-site responsibility fall under OSHA’s rules for grain handling facilities, 29 CFR 1910.272, and a turnkey scope does not automatically include local compliance. Put the name of whoever carries it into the contract.
The word turnkey costs a supplier nothing to type. What matters is what arrives with it:
A supplier who covers all four is selling you a line. A supplier who only ships containers is selling you a project to manage on your own, and the managing is the part that eats the first year.
We build in our own workshop, send our own engineers out and issue the wear-parts list before the container leaves, which is also why we can tell you what is and is not inside the scope. If you would rather see the workshop before deciding anything, this factory visit write-up walks through what a day there looks like.
In October 2026 a customer from Chad spent a day in our factory. He walked the manufacturing workshop, watched a reference mill of the same type running, and then spent most of the day on a single question: how fine the sorghum flour had to be for the market he sells into. What he signed at the end of the visit was a complete 20 TPD sorghum line covering cleaning, Schälen, Schleifen, Siebung und Verpackung, with 80–100 mesh written in as the target. Installation and commissioning are still ahead of us, so that figure is the target for the acceptance test rather than a result we can show you yet.
Two things from that visit matter more than the equipment list. Before anything was signed we went through the local power conditions and what the installation would need on site, so the electrical plan was drawn around an unstable grid rather than around a clean one. And installation, training and maintenance support were in the package from the first conversation. A mill in Chad can’t sit idle for two weeks waiting on a spare part, or on an answer.
The full 20 TPD sorghum milling line factory visit report includes the equipment breakdown and the questions he asked before signing, which are worth reading if your own grain happens to be sorghum.

All four of the things listed in section 4 move it, which is why we ask for the site before we quote. Ask every supplier for an itemized quotation broken down by section; a single total gives you nothing you can compare.
The two lines that disappear from cheap quotations are the structure between the machines, meaning bins, platforms and elevators, and the electrical and control work. Neither can be skipped. Bought later they cost more, and the request always lands after the budget was signed off.
Start from the market and work backwards to the machine. Take the tonnage you can sell month after month, then size the plant to it. Too big and the line idles while the payback stretches out; too small and it runs around the clock, misses maintenance and wears out early. If you want to see what a 20-ton configuration looks like, here is how a 20-ton wheat milling production line is put together.
The intake and cleaning section can be shared. The milling sections cannot. Rice is milled whole and the kernel is the product; flour comes from opening the grain and grinding what is inside. A dual-grain plant is really two milling lines standing behind one cleaning front end.
Check tempering before you touch anything else: how much water goes in, how evenly it is mixed, and how long the grain rests afterwards. Our piece on the wheat conditioning process takes those three apart one at a time. This is where most mills lose their yield, and it is also the cheapest place to get it back, since changing a water setting and a rest time costs nothing next to new rolls or a rebuilt flow.
There is no standard number, and a supplier who quotes one before seeing your site is guessing. What matters is that the schedule sits in the contract together with commissioning, training and the technician’s stay. Agree it before you sign, because after the containers ship the conversation gets a lot harder.
Ja, and they are built by the same engineers who design the large automated plants. A compact integrated line takes less floor space and keeps the first investment down, which is usually what decides whether a start-up reaches payback at all.
Three things. Your raw material and the state it arrives in; the capacity you need in tonnes per day, with the hours you plan to run; and the site, meaning dimensions, Deckenhöhe, power supply and whether a building is already standing. With those three we can draw a layout, list the equipment and put a price against it.
Warranty means whatever the quotation and the contract say, and nothing that was only said out loud. Scope, which parts count as wear parts, Arbeit, Fracht, the technician’s days and the acceptance test all belong on paper. Ask for the wear-parts list before delivery and you’ll know what to stock from the first week.
Send three things, get a preliminary design back.
Your raw material and its condition, your target capacity in t/d, and your site dimensions with the power supply. On those three, what comes back is:
A payback figure needs those economic inputs, and they belong to both sides. Once the technical scope is confirmed, we put the assumptions in writing together and run the numbers as scenarios, so you can see for yourself which inputs move the result.
Request a preliminary design →
Not ready for that yet? Send a photo of your grain and the grade you want to sell. Treat it as a quick screen, not a diagnosis: we will point to the section most likely to be limiting the line, and what is worth checking before you spend money on it.
Ein Vollkornmehlprojekt wird nicht durch den Namen seiner Mühle definiert. Vor dem Maschinenvergleich, Entscheiden Sie, was das fertige Mehl enthalten muss,...
Zwei Filter können gleichermaßen klar aussehende Proben erzeugen, hinterlassen jedoch unterschiedliche Ölmengen im Schlamm, Medien und Rohrleitungen. Vergleichen Sie sie anhand einer abgewogenen Menge..
Einer kleinen Ölmühle kann der Platz für die Kuchenverarbeitung ausgehen, während in den Öltanks noch Platz ist. Dimensionieren Sie die Empfangs- und Versandvereinbarung von....